Sign In | Join Free | My gimpguru.org |
|
Place of Origin : Zhejiang, China (Mainland)
Certification : ISO 9001 ISO14001 TS16949
Price : negotiable
Standard : ASTM, SA192
Thickness : 2.2 - 25.4 mm
Section Shape : Round
Outer Diameter(Round) : 12.7 - 177.8 mm
Application : Boiler Pipe
Technique : Cold Drawn
Surface Treatment : oil
Special Pipe : boiler tubes
Keywords : carbon steel seamless tube
End protector : Plain
Length : 1-12m
Type : SMLS
Shape : Round Shape
MTC : En10204.3.2B
MOQ : negotiable
seamless boiler steel tube
China supplier SA 192 boiler carbon steel seamless tube
Applications:
for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Manufacture:Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.
China supplier SA 192 boiler carbon steel seamless tube
high pressure seamless boiler tube
Heat treatment:Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher
Steel grade SA192 Chemical Composition & Mechanical properties
C | Mn | P | S | Si | Tensile Strength | Yeild point | Elongation |
0.06-0.18 | 0.27-0.63 | 0.035Max | 0.035Max | 0.25Max | min ksi[Mpa] 47[325] | min ksi[Mpa] 26[180] | ≥35% |
Hardness
Brinell Hardness | Rockwell Hardness Number |
WT≥0.200in(5.1mm) | WT<0.200in(5.1mm) |
137HRB | 77HRB |
China supplier SA 192 boiler carbon steel seamless tube
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of SA 192 boiler carbon steel seamless tube for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
![]() |
China supplier SA 192 boiler carbon steel seamless tube Images |